Pavia: Difference between revisions

Jump to navigation Jump to search
471 bytes added ,  6 months ago
(changed 2022 -> 2023)
Line 2,093:
The station currently hosts the following connections
 
'''Upper Level'''
* '''Platform 1 - Direct rail connection to the [[Icenia (CivMC)|Republic of Icenia]]''' - This rail goes over the Western Viaduct, a rail viaduct that cuts through the City of Pavia before moving underground after passing through the cities port.
 
* '''Platform 1 - Direct rail connection to the [[Icenia (CivMC)|Republic of Icenia]]''' - This rail goes over the Western Viaduct, a rail viaduct that cuts through the City of Pavia before moving underground after passing through the cities port.
* '''Platform 2 - Direct rail to [[Estalia|Estalia (0, 0)]] -''' This rail provides a direct connection to Estalia's 0,0 market. However, an additional /dest connection is available to the [[Volterra|Crowned Republic of Volterra]] - both states in the [[Elysian Pact]]
* '''Platform 3 W - [[One Day War|OneDest]] connection -''' The western track of platform 3 is a single-tracked connection to the [[OneDest]] network, and can be used to access a multitude of nations around the map.
* [[File:Pavia's International Railway Station.png|thumb|393x393px|The International Railway station as viewed from the Townhall Gardens. This building houses all the major connections from the City of Pavia to nations around the map. ]]'''Platform 3 E - Bedford Commons connection''' - The eastern track of platform 3 is a single-tracked direct connection to the Bedford Commons, a major population centre in the Empire of Pavia.
* '''Platform 4 - Direct rail to [[SPQR]] -''' This rail provides a direction connection to Elysian Pact ally SPQR, it also goes through the nation of [[Griffin]] which lays in between Pavia and SPQR. This rail goes over the Northern Viaduct, a over thousand block long viaduct that cuts through the entire Empire and continues into nation of [[Griffin]]. /dest SPQR can be used to continue straight through to SPQR without stopping at Griffin.
* '''Platform 75''' - Direct rail connection to [[Baile]]Nassau (under construction)
* '''Platform 5''' - This is a currently unused line reserved to support additional future underground connections to the north of the nation.
* '''Platform 6 -''' This is a currently unused line reserved to support additional future connections to the east of the nation. This rail is connected to the lower portion of the Northern Viaduct, however the Eastern Viaduct which is a branch of the Northern Viaduct has not yet been built.
'''Lower Level'''
* '''Platform 7''' - Direct rail connection to [[Baile]]
 
* '''Platform A''' - Direct rail to Aurelia (internal claim of Pavia) (under construction)
* '''Platform B''' - Direct rail to Deepslate Corporation
* '''Platform C''' - Direct rail to Baile
* '''Platform D''' - Direct rail to Vinland
* '''Platform E''' - Open
* '''Platform F''' - Direct rail to Gang Shi (under construction)
* '''Platform G''' - Direct rail to Volterra (under construction)
* '''Platform H''' - Direct rail to the Imperial Federation (under construction)
* '''Platform I''' - Direct rail to Mount Augusta (under construction)
* '''Platform J''' - Open
 
'''The Cathedral of Pavia'''
216

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu