New world rail

Revision as of 20:24, 4 March 2021 by Arthirob (talk | contribs) (Created page with "The new world rail is a rail tunnel connecting the main continent and the new world using the aqua nether shard. = History = On the 2nd of February 2021, Okx announce...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

The new world rail is a rail tunnel connecting the main continent and the new world using the aqua nether shard.

History

On the 2nd of February 2021, Okx announced on reddit [1] a reward of 150 stamina for the first person who would build a rail from the main shard to the New world. TTastic added 100 stamina to this bounty. The player ScoopyScoops instantly started the digging from west from Yamato's Aqua Nether. In the end of march, the BSR started to help from their side and they agreed on meeting at the -15K mark. The last rail was placed on the 4th of mars, a little more than one month after the announcement of the reward. A few people participated to the project by giving some materials like iron ingots.

Informations

Ressources costs

To dig the tunnel, approximetaly 90 000 stone blocks were destroyed, and 387 stacks of iron were used to craft the rails. 332 stacks of wheat were used to produce the high quantity of steel, as well as a compacted stack of clay, 2 of charcoal and some other crafting materials.

Location

In the main land, the entrance is located in Jeju's AN, -1467, -964, and in the new world, the entrance is located in Paradise's AN, -23970, -4880

Travel time

To tunnel takes 30 minutes[quantify] to be fully crossed over, which is 10 minutes shorter and more AFK friendly than using a boat.

References