Castelia
Castelia is a CivMC settlement that is situated within the Iaumean region of Cortesia Del Mar. Initially proclaimed in the Iaumean State on November 2nd, 2024, it has a main focus on build-friending.

Early Era
As Savster123_25 sought to make his mark on the Civ world on one random day in Iaumea, he thought of the idea of starting a new settlement. The main driving force behind this idea was that he thought it would be a fun idea if the Iaumean State had two municipalities (there was only one in Santiago at the time). On that very day, on November 2nd, 2024, Savster proclaimed that he was going to establish a new settlement, and on the same day, the project began. He first began the project by finding a suitable location for it to lie. After some planning, he chose for it to be situated in the savannah biome of the Iaumean state after finding a spot on the CivMC World map. When Savster arrived at his selected spot, he began landscaping to ensure spaciousness for potential builds and roads. After he thought the general landscaping was sufficient, he started building Castelia's first home in his house. For the design of his home, he used a YouTube tutorial on building a townhome to make his first home there. During the timeframe in which Savster was constructing the build, the Iaumean government asked Savster if he was interested in a rail being made to the work-in-progress settlement. Savster agreed, and it would be constructed sometime. Furthermore, on November 7th, 2024, Savster finished completing his first build and moved on to his next build, where he built a suburban home, whose design was also from a YouTube video. After this, Savster did not build for quite some time, but on November 17th, 2024, the Overland rail to Castelia was finally finished and allowed Castelia to reach Santiago with ease. For two days, nothing crazy happened until Castelia's second settler, TippyShippy, arrived in Castelia, where he made his first build, which was under a business entitled the "Iaumean Railway Company". In the future, TippyShippy would go on to become one of the key building figures in Castelia's history, building multiple apartments, shop buildings, etc. After Tippy's arrival, the two next major things that occurred were the construction of the Castelia Jail being finished and the town hall of Castelia being finished on November 24th, 2024. Both builds were constructed by Iaumean citizen Thinker33. These two final major builds being built mark the end of the early era.
The Transitional Era


This is denoted as the transitional era, as it occurs between the Iaumean State's final months of existence and the Incorporation of Iaumea within Cortesia Del Mar. At the start of the Transitional Era, Savster got back on the building grind, but instead of building homes this time, he was interested in going bigger. Thus, Savster decided to head into his creative world and cook up an apartment build. After finding out the general outline of how he wanted to build the apartment Savster decided to take his idea to life and build it in full. Savster started the build on December 17th, 2024 and finished it on December 19th, 2024. Moreover, the start of the period marked a huge amount of growth for Castelia both in population and in infrastructure with unknown and known residents building various builds including shops, apartments and even a melon farm (still used as our primary source of food currently). After finishing a job in Pavia, Savster earned quite a bit of money and wanted to put it to use. So not wanting to build something himself this time, he posted two jobs on the Iaumean discord server with the payment of 64 diamonds for each job. One sought a skilled builder to design and construct an observational tower build and another for storage tower build with the intention of housing building materials, tools etc. Iaumean citizen Nantyfall was interested and took on both jobs. He finished the Storage tower on March 3rd, 2025 and the observational tower the following day. The storage tower he built is considered to be one of most important builds in the history of the settlement with it still being used today. After these two builds were built, nothing major occured until Savster decided to start a new district within the settlement on April 5th, 2025. The name for it was initially was New Castelia but later on Savster decided to name it the Virbank District. Once established he went on a huge build grind many months later (Savster took a break from civ) and finished it's first apartment on June 21st, 2025, it's second apartment build subsequently and its third apartment build on June 28th, 2025. Due to the shape of the build having a appearance of it leaning, Iaumean citizen Lord_Pancakes suggested to Savster to name it, The Leaning Tower Of Castelia. Savster ended up taking in the suggestion and officially named it that. Castelia seemed to be doing great until the most Infamous event in Iaumean history occured in the Iaumean revolt. A huge battle between the Iaumean Rebels and the Iaumean Crown Government took place in Castelia on June 30th, 2025 ending with the Triune Emperor Of Iaumea pearled. After the revolt there was a dwindle in activity within Iaumea. At this point of time Savster decided to take a break from Castelia and main the nation's Heikki and Anguish, grinding for money along the way. On August 27th, 2025 the Iaumean state was no more and instead was incorporated into its predecessor Cortesia Del Mar. This ushered in a new era for the settlement.
Current Era

With the Cortesian government planning to connect the Iaumean region to the capital Montefiore, Savster began designing a subway station build. Once designed Savster began construction on the station on September, 19th 2025 and finished the station 6 days later on September 25th, 2025. Just a few hours before construction finished Savster put a poll on the Cortesian discord. The poll asked what name specifically out of all the names he handpicked should be the stations name. The handpicked name that won the poll was the, "Virbank Subway Station", becoming the name. Not much happened until Savster decided to do more work regarding the newly named Virbank Subway Station. With a huge interest in having a more optimal route to get to Pavia, Savster set his sights on building a rail line from Castelia to Rivia City, Rivia. Rivia is known to have a direct line straight to Pavia and with Rivia being so close to Castelia it just made complete sense to make a rail line to there. After some conversations with the Rivians they gave Savster the greenlight to finally begin work on the rail line. Initially Savster first began work tunneling to Rivia by himself but through a job he posted asking for help with the rail line he was able to get Cortesian citizen SuperSaiyanStick (A.K.A. Mya) to finish the remainder of the tunneling work. When this was finished he began phase two which involved gathering and placing copper and rails on the rail line. Savster finished the rail line completely on October 17th, 2025. This rail line to Rivia would be Castelia's main rail to Rivia until the AIM Network was finished later. Also, just one day prior to Savster finishing the rail line he was able to recruit a newfriend named Squash_Cat. Squash_Cat became a extremely important figure as of the current era. Squash started many projects in Castelia which included renovating many prexisting builds such as the melon farm, mines of Castelia and the Virbank Subway Station. He also designed and constructed his own pub in the Virbank District. Unfortunately it does not sell anything yet but Squash plans to do so in the future. The next notable build to be finished was AccordantAquarist's Two Top Tower on October 25th, 2025. Like the storage tower this was another build job that Savster gave to someone. An interesting thing about this build is that it was given to AccordantAquarist to complete prior to the incorporation of Iaumea in CDM. Furthermore, after a large amount of planning and construction Castelia finally became connected to mainland Cortesia. This mainly due to the hard work of AlzuBloxxer11 on the AIM rail network, which was fully completed on January 23rd, 2026. As of this being written the last two majors things to occur were the contruction of a chapel entitled, "The Chapel Of Blobfox". This was finished on February 2nd, 2026. The other major thing was the planned Castelia bunker being fully dug out on March 11th, 2026.

